Central Air-Conditioning Energy Saving · High-Efficiency Plant Rooms

Energy-saving retrofits for central air-conditioning plant rooms in existing buildings, covering chillers, distribution, terminals and controls. Cooling and water are supplied to match actual terminal demand, with chillers, pumps and cooling towers optimized together.

20%~35%
Overall savings rate
4~5
Post-retrofit system COP target
55%~70%
Cooling pump savings range
45%~60%
Chilled-water pump savings range
30%~50%
Cooling tower savings range

System Architecture

One system, four stages. The control platform collects operating data from each stage and regulates chillers, pumps and cooling towers as a whole.

Wisdom Control Platform · Group Optimization Chiller Plant Chillers · sequenced by efficiency Cooling towers · linked VFD operation Near wet-bulb heat exchange Distribution Chilled / cooling water pumps A/B bypass valves · decouple flows Headers · dynamic branch balancing Terminals VAV · fresh air by occupancy Fan coils · return-water control AHUs · CO2-linked Chilled water Terminal cooling Return water

Where Savings Come From

Industry baseline: over 90% of chiller plant rooms run below 3.5 in operating efficiency (excluding terminals), with system COP mostly between 2.0 and 3.6. Retrofits lift COP to 4–5, with most savings coming from pumps and cooling towers and only a small share from chillers.

1.02.03.64.05.06.0
Typical plant ~2.5
Retrofit target 4–5
Cooling pumps
55%~70%
Chilled-water pumps
45%~60%
Cooling towers
30%~50%
Chillers
3%~10%

SmartHVAC Solution

SmartHVAC has three parts: a variable-flow cooling tower system, a high-efficiency circulation system, and a high-quality system control system (the Wisdom platform).

Two-Way Variable Flow

Primary pumps run at fixed frequency to keep chiller flow constant, while terminal flow varies with load; A/B bypass valves decouple the two. See the three operating modes in the interactive diagram below.

Near Wet-Bulb Control

All cooling towers run on linked variable frequency to use the full heat-exchange area and operate near the wet-bulb temperature. See the control steps below.

Chiller Group Control

Multiple chillers are sequenced by efficiency and run preferentially in their high-efficiency range. Each 1 degree C drop in cooling-water temperature or 1 degree C rise in chilled-water temperature lifts chiller efficiency by about 3%-5%.

Water Equalizers & Variable-Flow Nozzles

Water is equalized between towers and distributed evenly across trays. Nozzles adapt to 20%–100% flow without drift or water carry-over at low flow. Fans run in their high-efficiency range at 25–42 Hz.

Reverse-Return & Low-Resistance Piping

Risers and mains use reverse-return layout with dynamic branch balancing at headers. Low-resistance filters and check valves replace pump-inlet Y-strainers, with 45° connections and no inverted-U bends.

Water Quality & Terminal Coordination

Water-quality monitoring and dosing, cooling-tower scale collectors and galvanized piping slow heat-exchange degradation. Terminal VAV and CO2-linked controls adjust fresh air to occupancy.

Modular Control Cabinets

Chiller, pump and cooling-tower control cabinets are managed together, with PLC and platform software customized per project. Balancing cabinets reserve space for balancing valves and support manual-control fallback.

High-Efficiency Plant Room Standards

ASHRAE: EER > 5.0 (0.7 kW/RT). GB 50189-2015: design-condition SCOP of at least 4.6 (excluding chilled-water pumps). The Wuhan project targets EER of at least 5.5, aiming for 6.0.

Verification Method

Functional targets are verified by measured indoor temperature and humidity. Efficiency targets are verified by third-party measurement after one month of stable operation, covering two cooling seasons, to obtain a project energy-efficiency rating certificate.

Two-way variable flow · bypass valve status
Chiller→Primary pump→Chiller bypass valve · Closed→Terminals→Terminal bypass valve · Open

Overtime mode: the terminal bypass valve is open to maintain minimum system flow.

Near Wet-Bulb Control Steps
Start at 45 HzFans start at 45 Hz on first start-up
Recalculate every 15 minReturn-water vs. wet-bulb approach
Hold at 2–3 °CHold frequency at 2–3 °C approach
Below 2 °C, step downStep down by 5 Hz, auto-stop at the 22 Hz floor; above 3 °C, step up by 5 Hz
Return-water protectionFull stop below 18 degrees C; all start at 22 Hz above 20 degrees C

Cases

Pangu Plaza

Pangu Plaza · Beijing

420,000 m² urban complex · offices + international apartments + 7-star hotel + commercial corridor

26.1%

Overall savings rate. Breakdown: chillers 3.4%, primary pumps 23.5%, secondary pumps 74.7%, high-rise tertiary pumps 18.8%, cooling pumps 47.3%, cooling towers 78.9%.

Chiller group controlCooling-tower variable flowPump VFD

Zhongtian Qiantang Yinzuo

Zhongtian · Qiantang Yinzuo · Hangzhou

HVAC system integration + plant-room energy control + terminal fan energy control

5.23

Full-season cumulative COP in 2021. In 2022: 474,061 kWh electricity, 2,754,294.41 kWh cooling, full-season EERa 5.81.

Plant-room group controlTerminal energy controlSub-metering

Hangzhou Hotel

Hangzhou Hotel · Hangzhou

546 Yan'an Road · 112 m, 32 floors

50.66%

Savings rate, before vs. after retrofit.

Before/after verificationSub-metering

AAC Technologies

AAC Technologies

Third-party testing

Chillers 4.6% Chilled-water pumps 43% Cooling pumps 62%

Third-party testingPump VFD

Alibaba Central China HQ, Wuhan

Alibaba Central China HQ · Wuhan

Zhongtian Zhihui high-efficiency plant room · original design EER 4.6 → operating target 5.5, aiming for 6.0

Cooling towers changed from 37 small-flow modules (382.5 kW) to 15 large-flow modules (330 kW), saving up to 52.5 kWh per hour; after chilled-water pump optimization, offices save about 30 kWh per hour and retail about 7 kWh per hour.

Larger tower selectionLinked VFDReverse-return pipingTwo-way variable-flow A/B valves

Tianjin Heping Impression City

Tianjin Heping Impression City · Plant Room & Terminal Controls

Underground chiller plant layout + system drawings · building HVAC water · cooling-tower and boiler piping · terminal control topology

Issued for construction in 2022: underground plant system drawings, building HVAC water optimization drawings, plant equipment foundation and electrical control drawings, terminal control drawings and overall topology for blocks A / B / BE / D / E, plus tender lists and high-efficiency HVAC hardware procurement schedules.

Plant system drawingsTerminal controlsBIM detailing

Energy Calculator

Estimate annual electricity saved and cost saved from total annual consumption and average tariff, using the overall 20%–35% range. A precise assessment requires the survey form and measured sub-metered data.

Complete Survey Form

Cooperation Models

Four funding and management models; specific terms are subject to contract.

Client Funds All

The client funds base and energy-saving equipment and keeps all energy-saving benefits.

90% Fee · 10-Year Management

The client funds base equipment and the investor funds energy-saving equipment. The client pays 90% of the original fee each year, the investor manages the plant room for 10 years, and equipment transfers to the client at term end.

Investor Funds Energy-Saving Equipment

The client funds base equipment and the investor funds energy-saving equipment. The client pays the original fee until the agreed cumulative amount is reached, then the investor exits and equipment transfers to the client.

Investor Funds All

The client funds no equipment. The investor funds base and energy-saving equipment and manages the plant room for 10 years; the client pays 90% of the original fee each year and buys back base equipment year by year, gaining full ownership at term end.

Contact Us

Hangzhou Tianfan Energy Saving Technology Co., Ltd.

Contact: Mr. Yin Tel: 15658188166

Project survey form: ac.iesure.com This site: iesure.com